33 PROJECTS BY STATE · COUNTS, NEVER A SCOREHEADLINE: DESIGN — THE LEAST-ADVANCED STATE PRESENT
7
DESIGN
11
PLANNING
9
IMPLEMENTATION
5
BLOCKED
1
CLOSING
The headline names the project that needs attention. It is never the furthest-along state and never an average.
AGENCY
PROJECTS
LEAST ADVANCED
LOOPS CLOSED
Directorate of Textbooks
6
DESIGN
1 of 6
Directorate of Planning
11
PLANNING
0 of 11
Teacher Training College — North
4
IMPLEMENTATION
1 of 4
Teacher Training College — South
3
BLOCKED
0 of 3
Provincial Education Service — Eastfield
9
PLANNING
0 of 9
A minister's grant reaches the aggregate and the project detail beneath it. Drilling down never needs a second permission.
TWO POPULATIONS · REPORTED SIDE BY SIDE, NEVER SUMMED
33
projects attached to an agency
46
activities with no project
WHAT THIS ROLLUP CANNOT SEE
Work that was never given a project.
A rollup built only from projects would report an agency as empty while its activities carry real budgets. The 46 are disclosed at this level and at every level above it.
On a phone the screen is shown as a small layout preview. Open this page on a larger screen to read it, or read the points below.
What this screen shows
Projects are counted by state. The headline names the least-advanced state, not an average.
Activities with no project are reported beside the projects, never summed into them.
Drilling down never needs a second permission.
Why it works this way
A rollup built only from projects would call an agency empty while its activities carry real budgets. So it reports both populations and says what it cannot see.
What exists today
Not built yet. Executive dashboards are in the product; this stage-count rollup is a design, and no route counts projects by stage.