projectsmanager.ai
Compared with spreadsheets

Keep Excel for what it is good at. Stop running the programme in it.

Almost every project unit runs on spreadsheets, and for good reason: they are flexible, everyone knows them and they cost nothing extra. The problems start when a workbook becomes the system of record for a multi-year, multi-unit programme. This page sets out where each one fits.

Credit where due

What spreadsheets do well

Analysis and modelling

Scenario costing, one-off analysis, quick charts and checking a figure from another angle. Nothing beats a spreadsheet for thinking with numbers.

Everyone can use them

No training, no licence request, no IT ticket. A district officer and a task team leader can open the same file.

Formats donors already accept

Many financiers supply their own templates as workbooks, and some submissions are expected in that form.

What breaks at scale

Six problems that grow with the programme

Versions

"AWP_final_v3_revised_FM.xlsx" is a familiar file name. When several units edit copies, nobody can say with certainty which version the report was built from.

Traceability

A total in a summary sheet may come from links to other workbooks, pasted values or a manual override. A reviewer asking "where does this come from?" can wait days for an answer.

Approvals

Approval happens by email, if at all. The workbook does not know who approved which version, or whether it changed afterwards.

Audit trail

Spreadsheets can track changes, but in practice the history of who changed a figure, and why, is rarely kept across copies.

Blanks summed as zero

When a unit has not reported, its empty cell adds nothing to the total, and the total looks complete. A missing report becomes a reported zero without anyone deciding it should.

Access

A workbook is shared whole. Giving one implementing unit its own view means making another copy, which brings back the version problem.

Side by side

Spreadsheets and projectsmanager.ai

NeedSpreadsheetsprojectsmanager.ai
Ad hoc analysis and modellingExcellentNot the purpose; use a spreadsheet alongside
Cost to startUsually already licensedFree plan; paid plans for larger use
One current version of the planDepends on disciplineOne shared record
Figure traced to its transactionsManual, if links are keptEvery figure opens to its records
Missing dataBlank cells summed as zeroShown as "not recorded"
Approval workflowBy emailRecorded steps
Who changed what, whenLimited, lost across copiesAudit trail on every record
Each unit sees only its own workSeparate copiesRole-based access
Read-only access for donorsSend a copyRead-only viewer role
Moving across

Start from the workbooks you have

You do not need to retype a programme. During onboarding we load your existing work plan and budget workbooks for you, and we provide your figures as spreadsheet files on request for analysis or a donor template. Self-service import and export are in development.

  1. Import

    We load the current annual work plan and budget from your workbook during onboarding.

  2. Check what is missing

    Cells that were blank arrive as "not recorded", so gaps are visible rather than hidden in a total.

  3. Keep Excel for analysis

    Model and chart in a spreadsheet from an extract of the figures. The record of what happened stays in one place.

See a programme that is not held together by links

The demo uses fictional data. Open any figure to see what it is built from.

Open the live demo Request a walkthrough